time-1.9: lib/Data/Time/Calendar/Gregorian.hs
{-# OPTIONS -fno-warn-orphans #-}
module Data.Time.Calendar.Gregorian
(
-- * Gregorian calendar
toGregorian,fromGregorian,fromGregorianValid,showGregorian,gregorianMonthLength,
-- calendrical arithmetic
-- e.g. "one month after March 31st"
addGregorianMonthsClip,addGregorianMonthsRollOver,
addGregorianYearsClip,addGregorianYearsRollOver,
addGregorianDurationClip,addGregorianDurationRollOver,
diffGregorianDurationClip,diffGregorianDurationRollOver,
-- re-exported from OrdinalDate
isLeapYear
) where
import Data.Time.Calendar.MonthDay
import Data.Time.Calendar.OrdinalDate
import Data.Time.Calendar.Days
import Data.Time.Calendar.CalendarDiffDays
import Data.Time.Calendar.Private
-- | Convert to proleptic Gregorian calendar. First element of result is year, second month number (1-12), third day (1-31).
toGregorian :: Day -> (Integer,Int,Int)
toGregorian date = (year,month,day) where
(year,yd) = toOrdinalDate date
(month,day) = dayOfYearToMonthAndDay (isLeapYear year) yd
-- | Convert from proleptic Gregorian calendar. First argument is year, second month number (1-12), third day (1-31).
-- Invalid values will be clipped to the correct range, month first, then day.
fromGregorian :: Integer -> Int -> Int -> Day
fromGregorian year month day = fromOrdinalDate year (monthAndDayToDayOfYear (isLeapYear year) month day)
-- | Convert from proleptic Gregorian calendar. First argument is year, second month number (1-12), third day (1-31).
-- Invalid values will return Nothing
fromGregorianValid :: Integer -> Int -> Int -> Maybe Day
fromGregorianValid year month day = do
doy <- monthAndDayToDayOfYearValid (isLeapYear year) month day
fromOrdinalDateValid year doy
-- | Show in ISO 8601 format (yyyy-mm-dd)
showGregorian :: Day -> String
showGregorian date = (show4 y) ++ "-" ++ (show2 m) ++ "-" ++ (show2 d) where
(y,m,d) = toGregorian date
-- | The number of days in a given month according to the proleptic Gregorian calendar. First argument is year, second is month.
gregorianMonthLength :: Integer -> Int -> Int
gregorianMonthLength year = monthLength (isLeapYear year)
rolloverMonths :: (Integer,Integer) -> (Integer,Int)
rolloverMonths (y,m) = (y + (div (m - 1) 12),fromIntegral (mod (m - 1) 12) + 1)
addGregorianMonths :: Integer -> Day -> (Integer,Int,Int)
addGregorianMonths n day = (y',m',d) where
(y,m,d) = toGregorian day
(y',m') = rolloverMonths (y,fromIntegral m + n)
-- | Add months, with days past the last day of the month clipped to the last day.
-- For instance, 2005-01-30 + 1 month = 2005-02-28.
addGregorianMonthsClip :: Integer -> Day -> Day
addGregorianMonthsClip n day = fromGregorian y m d where
(y,m,d) = addGregorianMonths n day
-- | Add months, with days past the last day of the month rolling over to the next month.
-- For instance, 2005-01-30 + 1 month = 2005-03-02.
addGregorianMonthsRollOver :: Integer -> Day -> Day
addGregorianMonthsRollOver n day = addDays (fromIntegral d - 1) (fromGregorian y m 1) where
(y,m,d) = addGregorianMonths n day
-- | Add years, matching month and day, with Feb 29th clipped to Feb 28th if necessary.
-- For instance, 2004-02-29 + 2 years = 2006-02-28.
addGregorianYearsClip :: Integer -> Day -> Day
addGregorianYearsClip n = addGregorianMonthsClip (n * 12)
-- | Add years, matching month and day, with Feb 29th rolled over to Mar 1st if necessary.
-- For instance, 2004-02-29 + 2 years = 2006-03-01.
addGregorianYearsRollOver :: Integer -> Day -> Day
addGregorianYearsRollOver n = addGregorianMonthsRollOver (n * 12)
-- | Add months (clipped to last day), then add days
addGregorianDurationClip :: CalendarDiffDays -> Day -> Day
addGregorianDurationClip (CalendarDiffDays m d) day = addDays d $ addGregorianMonthsClip m day
-- | Add months (rolling over to next month), then add days
addGregorianDurationRollOver :: CalendarDiffDays -> Day -> Day
addGregorianDurationRollOver (CalendarDiffDays m d) day = addDays d $ addGregorianMonthsRollOver m day
-- | Calendrical difference, with as many whole months as possible
diffGregorianDurationClip :: Day -> Day -> CalendarDiffDays
diffGregorianDurationClip day2 day1 = let
(y1,m1,d1) = toGregorian day1
(y2,m2,d2) = toGregorian day2
ym1 = y1 * 12 + toInteger m1
ym2 = y2 * 12 + toInteger m2
ymdiff = ym2 - ym1
ymAllowed =
if day2 >= day1 then
if d2 >= d1 then ymdiff else ymdiff - 1
else if d2 <= d1 then ymdiff else ymdiff + 1
dayAllowed = addGregorianDurationClip (CalendarDiffDays ymAllowed 0) day1
in CalendarDiffDays ymAllowed $ diffDays day2 dayAllowed
-- | Calendrical difference, with as many whole months as possible.
-- Same as 'diffGregorianDurationClip' for positive durations.
diffGregorianDurationRollOver :: Day -> Day -> CalendarDiffDays
diffGregorianDurationRollOver day2 day1 = let
(y1,m1,d1) = toGregorian day1
(y2,m2,d2) = toGregorian day2
ym1 = y1 * 12 + toInteger m1
ym2 = y2 * 12 + toInteger m2
ymdiff = ym2 - ym1
ymAllowed =
if day2 >= day1 then
if d2 >= d1 then ymdiff else ymdiff - 1
else if d2 <= d1 then ymdiff else ymdiff + 1
dayAllowed = addGregorianDurationRollOver (CalendarDiffDays ymAllowed 0) day1
in CalendarDiffDays ymAllowed $ diffDays day2 dayAllowed
-- orphan instance
instance Show Day where
show = showGregorian